How Do You Get a Building Permit in Florida in 2026?

Learn how to get a Florida building permit: find your jurisdiction, gather plans, handle reviews, pass inspections, and know when to get expert help.

Published 2026-11-19 Updated 2026-11-1914 min read
How Do You Get a Building Permit in Florida in 2026?

Key Takeaways

  • Confirm which city or county controls your property before drawing plans or filing forms, since building permits are issued locally and jurisdiction is not always obvious near city lines.

  • Permits are required for most new construction, additions, remodels, roofing, impact windows, electrical, plumbing, HVAC, pools, solar, and demolition; small cosmetic jobs like painting are usually exempt.

  • Most delays come from incomplete packages, such as missing documents or plan details that don't match code; answer every reviewer comment fully and resubmit the complete corrected set.

  • Florida law requires local agencies to allow electronic submission of complete applications, and a reviewer must give written notice of incomplete items within 10 business days (5 for eligible single-trade residential reviews).

  • Request every required inspection before work is covered or hidden, and submit any plan changes for approval before building them, or you may need engineer letters or extra verification later.

  • Timelines and fees vary by jurisdiction; for example, Seminole County cites 7-10 business days for plan review, but confirm current figures with your local building department.

Picture this: you have a signed contract, a crew on the calendar, and materials on order. Then someone asks, "Where is the permit?" Suddenly your whole schedule depends on a stack of paperwork you have not started. If that sounds familiar, take a breath. Almost everyone who builds in Florida has been there, and the process is far more manageable once you see the full picture.

This guide explains como sacar un permiso de construccion en florida, or in plain English, how to get a building permit in Florida. We will walk through where to apply, what documents you need, how reviews and inspections work, and where a Florida permitting service can lend a hand. Whether you are a homeowner planning an addition, a general contractor juggling several jobs, a solar installer, or a real estate pro evaluating a property, you will find a clear path here.

One honest note up front: costs, timelines, and portals change from one city or county to the next. Use this as your roadmap, then confirm the details with your local building department.

como sacar un permiso de construccion en florida

Step One: Find Out Who Actually Controls Your Property

In Florida, building permits are issued by the building department of the city or county that has jurisdiction over your property. There is no single statewide permit office. Requirements, forms, fees, and online portals all vary by locality.

The tricky part is that jurisdiction is not always obvious. A home with a city mailing address may sit in unincorporated county land, and the reverse can also happen. Near city lines, the wrong guess can cost you weeks. Confirm the controlling jurisdiction before you draw a single line or fill out a single form. If you want a hand, our building department lookup tool is a good starting point.

como sacar un permiso de construccion en florida

What Kinds of Work Need a Permit in Florida?

Most new construction, additions, and remodels need a permit before work begins. The permit authorizes the work to proceed according to approved plans, the Florida Building Code, and any local requirements.

Common permitted projects include:

  • New homes, additions, and garage conversions
  • Structural changes, including removing or altering walls
  • Roofing and re-roofing
  • Impact windows and doors
  • Electrical, plumbing, and mechanical (HVAC) work
  • Pools, spas, and screen enclosures
  • Solar panels and battery storage
  • Demolition
  • Commercial tenant improvements and build-outs

Small cosmetic jobs, like painting, are usually exempt. Still, the line between "minor" and "permitted" differs by jurisdiction, so check first. Guessing wrong is the number one way owners end up with unpermitted work, which can surface later at a sale, an appraisal, or an inspection.

The Florida Permit Process, Step by Step

Here is the general flow most Florida projects follow. Your local department may add or reorder a step, but the backbone stays the same.

  1. Identify the correct permit type. A reroof, a pool, and an addition each have different applications and review paths.
  2. Confirm jurisdiction and requirements. Look up the forms, fees, and submission method your city or county publishes.
  3. Gather your documents. This usually means the application, plans, contractor license information, and property details.
  4. Submit the package. Most departments accept online submissions through a portal, and state law requires agencies to allow electronic submission of complete applications.
  5. Respond to review comments. Reviewers may request corrections or more information.
  6. Pay fees and receive the permit. Post the permit as your jurisdiction instructs.
  7. Schedule inspections. Call for each required inspection at the proper stage of work.
  8. Pass final inspection and close the permit. This formally wraps up the project.

That is the whole journey. Most delays do not come from any one step being hard. They come from small gaps, such as a missing document, a plan detail that does not match code, or a comment that sits unanswered.

What Documents and Plans Will You Need?

The exact list depends on the work and the jurisdiction, but most applications include several of the following items.

Document Why It Matters Often Needed For
Completed permit application Starts the formal review All permits
Construction plans or drawings Show the work to be built Additions, new builds, structural, remodels
Site plan or survey Shows setbacks and placement Additions, pools, accessory structures
Structural or engineered drawings Prove the design meets wind and load requirements Structural work, roofs, screen enclosures
MEP drawings Detail electrical, plumbing, and mechanical systems Commercial work, larger remodels
Contractor license and insurance Confirms who is legally doing the work Contractor-pulled permits
Property information Identifies the parcel and owner All permits
Other agency approvals Zoning, flood, wetlands, or environmental sign-offs Projects near water or in special zones

Some projects also trigger extra reviews for zoning, flood zones, or wetlands. If your lot is near the coast or a protected area, expect more layers.

Plans are where many applications stall. Drawings must reflect the Florida Building Code, local amendments, and the wind-load requirements that apply to your location. If you want to understand what a solid plan set looks like, this guide on permit-ready plans that Florida officials approve breaks it down. For residential work, structural plans for a Florida residential permit covers the engineering side.

How Long Does It Take, and What Does It Cost?

Here is the straight answer: it depends on your jurisdiction, your project type, and how complete your package is. No single statewide timeline or fee schedule exists.

To give you a feel for real-world numbers, Seminole County publishes reference timeframes of 1 to 2 business days for zoning review and 7 to 10 business days for plan review. Seminole also notes that after you start an online application, you have 7 calendar days to upload the complete package. Treat these as local, indicative figures, not guarantees and not a statewide rule.

Florida law does set some guardrails. Under Florida Statutes 553.791, a local official must give written notice of certain incomplete forms or documents within 10 business days. For an eligible single-trade review on a single-family or two-family home, that window is 5 business days. Florida Statutes 553.79 also requires local agencies to publish permit types and requirements, update application status, and allow electronic submission of complete applications.

Factor How It Affects Timing and Cost
Project type Single-trade permits can move fast; plan-review permits take longer
Package completeness Missing items trigger comments and restart the clock
Jurisdiction workload Busy departments have longer queues
Special reviews Zoning, flood, or environmental reviews add steps
Valuation and scope Fees often scale with project size

For local examples, see how to estimate your Orlando building permit timeline and how long a building permit takes in Fort Myers.

What Happens When the Reviewer Pushes Back?

It is completely normal to get comments. If plans do not meet code or documents are missing, the department will request corrections or additional information. Pending comments or an incomplete package are the most common reasons approvals take longer than expected.

The best way to handle comments is to answer each one directly, update the affected sheets, and resubmit the full corrected set. Sloppy or partial responses just trigger another round. If you have been denied, you are not out of options. This article on rescuing a denied building permit in Florida explains how to recover. Our team also handles revisions and resubmittals every day.

Inspections: The Part People Forget

Getting the permit is not the finish line. Once it is issued, the permit holder must request the required inspections at the stages the department specifies, usually before any work is covered or hidden. Think footings before concrete, framing before insulation, and rough-in before drywall.

Two rules to remember:

  • Any change to the approved plans must be submitted for approval before you build it.
  • The project is not closed until it passes final inspection and the permit is closed out.

Skipped inspections cause real headaches later. If work gets covered without a sign-off, you may need an engineer letter or extra verification to fix it. See how to handle covered work that missed inspection for the details. And if your building also needs final occupancy approval, here is how to get a Certificate of Occupancy in Florida.

Can You Pull the Permit Yourself?

Many people wonder whether they can handle this on their own. The answer is often yes, with caveats.

Who Applies Best For Things to Know
Licensed contractor Most projects Contractor license and insurance are verified on the application
Owner-builder Homeowners building on their own property Special rules and limits apply, and you take on the responsibility
Permitting service Busy contractors, owners, and agents Prepares and files the package, tracks it, and answers comments

Owner-builder permits come with their own conditions, including restrictions on selling soon after completion. If you are considering that route, read about owner-builder permits first and compare it with DIY versus pro help on Florida code compliance.

One important point: a permitting service can prepare, file, and track your package, but it does not replace the official approval. Only the building department issues the permit. What a good service does is clear the path and keep things moving.

Private Providers: A Faster Lane in Some Cases

Florida law allows owners and contractors to use private providers for plan review or inspections in certain situations. Availability and scope depend on the project and on legal and local requirements, and a private provider does not automatically replace local reviews for zoning, flood, site, or other administrative matters.

When it fits, it can shorten your wait by taking plan review out of the county queue. To learn more, read how to use private provider plan review in Florida in 2026 or see our private provider services.

Tips by Audience: What Matters Most to You

General Contractors and Design Trades

Volume is your challenge. Standardize your submission checklist, make sure your license registration is current in each municipality, and answer comments quickly. Outsourcing drafting and engineering can keep jobs moving without adding headcount. See our pages for general contractors and municipality registration.

Solar Companies

Solar jobs live and die by clean structural and electrical documentation. Incomplete packages are a top cause of rejections, so double-check before filing. These common solar filing mistakes are worth a read, and our solar contractor support covers the rest.

Real Estate Professionals

Before a listing or purchase, check for open or expired permits. They can stall a closing at the worst moment. Learn how to find open permits on a Florida property and try our open permit search.

Homeowners and Residential Property Owners

Start with the basics: confirm the jurisdiction, decide whether you need engineered plans, and keep every document in one folder. If your project involves an addition, 10 things to know before adding a room in Florida is a friendly place to begin.

What If Work Was Already Done Without a Permit?

It happens more often than you would think, especially with older homes or work done by a prior owner. The good news is that Florida has a path to fix it. Unpermitted work can often be legalized through an after-the-fact permit, usually with as-built drawings and sometimes an engineer letter or field verification. Start with this guide to legalizing unpermitted work or our after-the-fact and expired permits service. If a stop work order or a stalled closing is the problem, our urgent permit rescue team is built for exactly that.

How 1 Contractor Solutions Helps

Think of 1 Contractor Solutions as Florida's outsourced permitting department. We work in all 67 Florida counties, and we handle the whole chain: figuring out which jurisdiction controls your address, preparing or reviewing plans, filing the application, tracking it, working every reviewer comment, and carrying it through approval and closeout. Our drafting and engineering are in house, and our own engineer signs and seals the work, so when a reviewer flags something, we fix it without waiting on an outside consultant.

We are also a licensed private provider, which means we can perform plan review ourselves in eligible cases. We answer 24/7, respond within 30 minutes, and se habla español. You can follow our updates on LinkedIn and Facebook, and our marketing partners at Brain Buzz Marketing help us share what we learn. Curious what clients say? Visit us on Google — 1 Contractor Solutions and read the reviews.

Your Quick Permit Checklist

  • Confirm which city or county has jurisdiction
  • Verify that your project needs a permit and which type
  • Collect plans, site information, and license details
  • Submit a complete package through the local portal
  • Answer every review comment fully and promptly
  • Schedule inspections before covering any work
  • Pass final inspection and close the permit

Ready to Get Your Permit Moving?

Getting a building permit in Florida comes down to knowing your jurisdiction, submitting a complete package, answering comments quickly, and following through on inspections. None of it is magic, and with the right prep you can avoid most of the common delays. If you would rather hand the paperwork to people who do this every day, get a free quote and tell us your address and your project. We will tell you exactly what it takes and then go do it. Permits approved. Projects moving.

FAQs

Where do I apply for a building permit in Florida?

You apply with the building department of the city or county that has jurisdiction over your property. Forms, fees, and portals differ by location, so confirm the controlling jurisdiction first, especially near city lines.

What documents do I need to get a building permit in Florida?

Most applications need a completed form, construction plans, property details, and contractor license information. Depending on the work, you may also need a site plan, structural or MEP drawings, and approvals from other agencies.

How long does it take to get a building permit in Florida?

It depends on your jurisdiction, project type, and how complete your package is. For reference, Seminole County lists 7 to 10 business days for plan review, but that is a local figure, not a statewide guarantee.

Can I pull a building permit myself, or should I hire a permitting service?

Homeowners can sometimes pull owner-builder permits, but special rules and responsibilities apply. A permitting service can prepare, file, and track your package and answer reviewer comments, though only the building department can issue the permit.

What inspections do I need after I get my permit?

You must request the required inspections at the stages your department specifies, usually before work is covered. Changes to approved plans need approval first, and the project must pass final inspection to close the permit.

Need this handled?

We do this work every day across all 67 Florida counties. Call (866) 314-6931 and we will tell you what your situation actually requires — including when you do not need us.

Related services

Permit Facilitation & Filing

You have a crew scheduled, a client asking for dates, and a permit sitting somewhere in a queue you cannot see. We file it, w…

See the service

Plan Review Coordination

A permit in plan review is not one queue. On a commercial project it can be six queues, each with its own reviewer, its own c…

See the service