10 After the Fact Permitting Florida Steps to Know (2026)

Unpermitted work in Florida? Learn 10 steps for after the fact permitting, from finding jurisdiction to as-builts, inspections, and closing it out in 2026.

Published 2026-10-10 Updated 2026-10-1011 min read
10 After the Fact Permitting Florida Steps to Know (2026)

Key Takeaways

  • Getting a permit does not automatically close a code enforcement case or remove fines; you typically must satisfy both the permitting side and the enforcement side.

  • Confirm which city or county building department has jurisdiction over your property before doing anything else, since boundary confusion can send your file to the wrong office.

  • Disclose unpermitted work honestly from the start, because inspectors will see conditions on site anyway and clear disclosure usually makes review smoother.

  • Concealed work may need to be exposed for inspection, and whether a engineer's letter can substitute for physical verification depends on the local authority, so ask early.

  • Fees, penalties, and timelines vary by jurisdiction and there is no statewide uniform surcharge, so get answers from the office with authority over your property.

  • Resolve unpermitted work before a sale or refinance when possible, since it can complicate appraisals, inspections, title reviews, and lender requirements.

Let's be honest: finding out that a deck, a reroof, a bathroom remodel, or a solar install went up without a permit is a gut-punch. Maybe a prior owner skipped the paperwork. Maybe a contractor vanished. Maybe a buyer's inspector flagged something days before closing. Take a breath. This happens to Florida property owners and contractors every single day, and there is a clear path forward.

That path is after the fact permitting in Florida. It means applying for a permit after regulated work has already started or been finished without one. It does not erase the original violation, but it is the standard route to document the work, verify it meets code, and bring it into compliance. Here are 10 steps and facts that will help you move through it with confidence in 2026, whether you are a homeowner, general contractor, solar company, realtor, or design professional.

after the fact permitting florida

1. Understand What After the Fact Permitting in Florida Really Means

After the fact permitting is the local process for seeking approval of construction, alteration, repair, or demolition that happened without the required permit. Think of it as a documented path back to compliance, not a pardon.

Florida Statutes §553.79(1)(a) sets the general rule that a permit is required before covered building work begins, subject to statutory exceptions. When work skips that step, the property owner or contractor typically applies for a retroactive permit and proves the work meets the Florida Building Code.

If you want a deeper primer, read our guide on what after-the-fact permitting in Florida is.

after the fact permitting florida

2. Identify the Correct Jurisdiction First

Florida has one statewide building code framework, but your city or county building department runs the show. Forms, documentation, inspections, fees, and enforcement timelines vary from office to office, so the first move is confirming who actually has authority over your address.

Property near a city boundary can surprise people. An address that sounds like it belongs to one city may be reviewed by the county, or the other way around. Our building department lookup tool helps you check, and our article on which Florida jurisdiction reviews your project explains the common traps.

3. Read Any Violation Notice Carefully

If a code enforcement notice is attached to your property, it is the most important document in your file. It names the violation, sets deadlines, and tells you who to contact.

Here is a key point many people miss: getting a permit does not automatically close a code enforcement case or remove penalties. You typically need to satisfy both the permitting side and the enforcement side. Palm Beach County, for example, says applicants with an active code violation should include the notice with the application and complete required inspections within the time set by code enforcement staff or the board.

If you have received a notice, our code compliance violations help page walks through the options.

4. Disclose the Work Honestly

It is tempting to downplay what happened. Resist that urge. Building departments expect you to disclose unpermitted work, and clear, accurate disclosure usually makes the review smoother. Inspectors will see the conditions on site anyway.

Describe exactly what was built, when it was done if you know, and whether a contractor was involved. If a prior owner did the work, say so. Our article on what to do if a prior owner skipped permits covers that situation in detail.

5. Gather the Right Documents and Drawings

The paperwork you need depends on the work, but most after the fact packages include some combination of the items below.

Document Why It Matters Common For
Permit application Opens the retroactive file with the correct jurisdiction All projects
Violation notice (if any) Ties the permit to the open enforcement case Properties under citation
As-built drawings Documents what actually exists on site Additions, remodels, structures
Site plan or survey Shows setbacks and placement on the lot Sheds, pools, additions, walls
Engineer letter or sealed plans Verifies structural or technical compliance Roofs, trusses, enclosures, slabs
Product approvals or specs Confirms materials meet Florida requirements Windows, doors, roofing

If you are not sure which drawings apply, our guide to gathering after-the-fact documents is a helpful checklist.

6. Know When You Need As-Built Drawings

As-built drawings capture the work exactly as it was constructed, not as someone might have planned it. They are the backbone of many retroactive permits because the reviewer needs to see what is really there.

For a patio enclosure, a garage conversion, or an interior remodel that moved walls, accurate as-builts help the plan reviewer confirm layout, egress, and code compliance. Our as-built drawings service handles this, and you can learn more in how to prepare as-builts for an after-the-fact permit.

7. Expect Plan Review and Inspections

Plans and inspections remain central. Section 553.79(2) generally requires review of plans and specifications for code compliance before a permit is issued, subject to statutory exceptions. After the fact permits are no shortcut around that rule.

Here is the typical sequence most Florida applicants experience:

  1. Contact the correct building department and disclose the unpermitted work.
  2. Submit the permit application along with plans or as-built documentation.
  3. Include any notice of violation if one exists.
  4. Pay applicable fees as set by the local enforcing agency.
  5. Respond to plan review comments and submit revisions if needed.
  6. Schedule and pass required inspections.
  7. Close the permit and confirm the code enforcement case is resolved.

Our plan review coordination and revisions and resubmittals services exist for exactly this stage, so comments get answered quickly.

8. Be Ready for Concealed Work and Engineering Questions

Here is where after the fact permitting gets unique. Inspectors can only approve what they can verify. If completed work is hidden behind drywall, under a finished floor, or above a ceiling, the jurisdiction may ask you to expose portions or provide other evidence it accepts.

For structural, roofing, or other technical work, an engineer or architect may be needed to document existing conditions or provide plans. Whether a professional letter can stand in for physical inspection is up to the local authority, so confirm with the building department instead of assuming. Our engineer letters and structural engineering teams work with sealed drawings produced in house, which keeps reviewer comments from turning into long delays.

You may also like our explainer on whether a sealed drawing is required for after-the-fact permits.

9. Budget Realistically for Fees and Timelines

No statewide fee amount or uniform after the fact surcharge exists. Fees, any added penalties, and review timelines depend on the local enforcing agency and, where applicable, code enforcement. Some jurisdictions charge extra for work done without a permit. Others do not. The only reliable answer comes from the office that has jurisdiction over your property.

Cost or Time Factor What Drives It
Permit fees Local fee schedule and project valuation
Possible added fees or penalties Local ordinance and the specific enforcement case
Drawings and engineering Scope, complexity, and what is concealed
Corrective work What inspectors find during verification
Review and inspection time Department workload and how many rounds of comments occur

For a closer look at pricing, see our posts on after the fact permit costs in Florida and typical after-the-fact permit fees.

10. Plan Ahead for Sales, Refinancing, and Closings

Unpermitted work has a funny way of showing up at the worst moment: during an appraisal, a home inspection, or a title review. If you are selling or refinancing, resolving it early can save weeks of stress.

Realtors and investors often run into this when evaluating properties, so checking for open or unpermitted items up front is smart. Our open permit search tool is a great first look, and our realtor and closing support team helps keep deals moving. If a deadline is already ticking, our urgent permit rescue service is built for denials, stop work orders, and held-up closings.

For a helpful read on the sales side, try can a home sale close with unpermitted work in Florida.

Who Benefits Most From After the Fact Permitting

Different readers come to this topic with different worries. A few common scenarios:

  • Homeowners who bought a property with a prior owner's unpermitted addition, patio enclosure, or remodel.
  • General contractors who inherited a job where a sub skipped the permit or let it expire.
  • Solar companies that need to document installations that went in without proper filings.
  • Real estate professionals and investors who find unpermitted items during due diligence.
  • Architects, designers, and specialty trades who need dependable drafting and sealed engineering behind a retroactive package.

If you fall into one of these groups, our pages for homeowners, general contractors, and solar contractors explain how we help.

How 1 Contractor Solutions Can Help

1 Contractor Solutions acts as Florida's outsourced permitting department. We take on after the fact and expired permits across all 67 counties, from pulling the right jurisdiction and preparing as-builts to coordinating plan review and carrying the file through closeout. Because our drafting and engineering are in house, our own engineer signs and seals the work, so reviewer comments get fixed fast instead of bouncing between outside consultants.

Curious how others feel about working with us? You can visit us on Google — 1 Contractor Solutions and see what customers say. You can also follow us on LinkedIn or follow us on Facebook for Florida permitting updates.

For the statutory background, the Florida Legislature publishes the text of Florida Statutes Section 553.79, which lays out the general permit requirement and plan review rules.

The Bottom Line

After the fact permitting in Florida is very doable when you approach it in the right order: identify the jurisdiction, read any notice, disclose the work, gather as-builts and engineering, work through plan review and inspections, and confirm that code enforcement is closed out too. The sooner you start, the more options you tend to have, especially if a sale or refinance is on the horizon.

You do not have to figure it out alone. If you are ready to move forward, get a free quote and let our team map out the fastest compliant path for your property. We respond within 30 minutes, day or night, and se habla español.

FAQs

How do I get an after the fact permit in Florida?

Start by confirming which city or county building department has jurisdiction over your property. Then disclose the unpermitted work, submit the permit application with plans or as-built documentation, pay the local fees, and pass the required inspections. If there is a code enforcement notice, include it and confirm what is needed to close that case too.

Will Florida make me open walls or ceilings to inspect unpermitted work?

Possibly. If completed work is concealed and cannot be verified as built, the local authority may require portions to be exposed or ask for other evidence it accepts. Requirements vary by jurisdiction, so it is smart to ask your building department early rather than assume a letter alone will do.

Does an after the fact permit resolve a code enforcement violation or fine?

Not automatically. Getting the permit and passing inspections is a major step, but you should also follow the deadlines on your notice and confirm with code enforcement what is required to close the case. Fees and consequences depend on the local ordinance and your specific situation.

Do I need a Florida-licensed engineer to legalize unpermitted construction?

It depends on the work. Structural, roofing, and other technical projects often call for an engineer or architect to document existing conditions or provide sealed plans. Your building department will tell you exactly what it requires, so confirm before you commission any drawings.

Can I sell or refinance a Florida home with unpermitted work?

Sometimes, but unpermitted work can complicate appraisals, inspections, title reviews, and lender requirements. Resolving it before listing or refinancing usually makes the process smoother and gives you more negotiating power.

Need this handled?

We do this work every day across all 67 Florida counties. Call (866) 314-6931 and we will tell you what your situation actually requires — including when you do not need us.

Related services

Permit Facilitation & Filing

You have a crew scheduled, a client asking for dates, and a permit sitting somewhere in a queue you cannot see. We file it, w…

See the service

Plan Review Coordination

A permit in plan review is not one queue. On a commercial project it can be six queues, each with its own reviewer, its own c…