How to Get a Municipality After-the-Fact Permit in Florida
Built without a permit? Learn the step-by-step process for a municipality after-the-fact permit in Florida, from jurisdiction to documents, costs, and inspections.

Key Takeaways
-
Confirm which municipality or county has jurisdiction over your property before applying, as mailing addresses can be misleading; use the property appraiser website and call the building department directly to verify.
-
After-the-fact permits are not automatic approvals; the building department reviews finished work against applicable building, zoning, and local codes just like new construction, and may require corrections.
-
Each Florida jurisdiction sets its own ATF fees, documentation requirements, and processes; some charge double the standard permit fee while others do not, so verify current costs with your local authority before budgeting.
-
Do not expose concealed work behind walls or ceilings until consulting the building department; a sealed engineer letter is often the most cost-effective way to document hidden work and satisfy compliance verification.
-
Unpermitted work resurfaces at critical moments like home sales, refinancing, or insurance claims, potentially causing delays, fines, or liens; resolving it early through the ATF process prevents costly complications.
-
Respond quickly and completely to plan review comments during the application process; inspections must pass and the permit must be officially closed in the municipality's system to avoid future title and financing issues.
So, you just discovered that a deck, a re-roof, a pool cage, or a kitchen remodel was built without a permit. Maybe you bought the house that way. Maybe a contractor promised to pull the permit and never did. Take a breath. This happens to Florida property owners all the time, and it is very fixable.
The fix is called an after-the-fact permit, or ATF. A municipality after the fact permit in Florida is simply a building permit application for work that was already built, or already started, without the required approval. Your city or county building department reviews it, decides what proof it needs, and, if everything checks out, finally approves and closes it out.
In this guide, we will walk you through the process step by step, from figuring out which municipality actually controls your property to documents, inspections, costs, and what happens when work is hidden behind a wall. Whether you are a homeowner, a general contractor, a solar company, or a real estate professional, you will leave knowing exactly what to do next.

What Is an After-the-Fact Permit in Florida?
Florida law is clear on the starting point: under Florida Statutes §553.79, it is unlawful to construct, alter, repair, or demolish a building without first obtaining a permit from the appropriate enforcing agency. When that step gets skipped, the after-the-fact route is how owners get back into compliance.
Here is the part that surprises many people. An ATF permit is not a rubber stamp. It is not a waiver of code requirements, and it does not guarantee approval. The local building department reviews the finished work against the applicable building, zoning, and other local rules, just as it would for any other project.
The state sets the rule that permits are required. The municipality or county sets how the ATF process actually works. That includes fees, forms, documentation, inspections, and enforcement. For a deeper primer, see our explainer on what after-the-fact permitting is in Florida.

Step 1: Confirm Which Municipality or County Has Jurisdiction
Before you do anything else, find out who actually issues permits for your address. This sounds simple, but it trips up a lot of owners, especially near city lines.
A city generally handles permits within its municipal limits. A county typically serves unincorporated areas and, in some cases, particular municipalities under an agreement. A mailing address that says "Tampa" or "Orlando" does not always mean the city is your permitting authority. Confirm with the local building department before you apply.
- Pull your property address and parcel number from your deed or the property appraiser website.
- Check whether the parcel sits inside city limits or in unincorporated county.
- Call the building department and ask whether they accept after-the-fact applications for your type of work.
- Ask for their written ATF checklist, fee schedule, and submittal method.
Our building department lookup tool can help you find the right office quickly. If you are not sure which agency reviews your project, this guide on which Florida jurisdiction reviews my project breaks it down.
Step 2: Check for Open Permits and Violations
Next, find out what is already on record. Sometimes the "unpermitted" work turns out to be an expired or open permit that was never closed, which is a different fix than a true ATF application. Other times, a code enforcement case already exists.
- Search the municipality's permit portal for your address.
- Look for expired, open, or inactive permits tied to the same scope of work.
- Check for any notice of violation, stop work order, or code case.
- Ask the building department whether a hold is affecting your property.
Our open permit search tool is a good place to start. If you find an expired permit rather than no permit at all, take a look at after-the-fact and expired permit services to see how those cases differ.
Step 3: Gather the Documentation the Municipality Requires
This is where most of the real work happens. Every jurisdiction has its own list, but you should expect to document the work thoroughly. Applications commonly ask for some combination of the following:
| Document | Why the Municipality Asks for It |
|---|---|
| Completed ATF permit application | Identifies the property, owner, scope, and valuation of the work |
| As-built drawings or plans | Shows what was actually built so reviewers can check code compliance |
| Site plan or survey | Confirms setbacks, lot coverage, and zoning requirements |
| Engineering report or sealed letter | Verifies structural, wind-load, or electrical adequacy |
| Product approvals and specs | Shows that windows, doors, roofing, or equipment meet Florida requirements |
| Contractor license and insurance info | Confirms who performed or will correct the work |
| Photos of the completed work | Gives reviewers a visual record, especially for concealed items |
Some jurisdictions also remind applicants that separate deed restrictions, HOA rules, or permits from other government agencies may apply. For example, the City of Marathon's ATF application cautions that other approvals may still be needed. Always ask what else is required beyond the building permit itself.
Need drawings of what already exists? Our as-built drawings and site plans are built for exactly this situation.
Step 4: Handle Concealed Work the Right Way
What if the work is hidden behind drywall, under a floor, or above a ceiling? This is one of the most common worries, and it is a fair one.
If work is concealed, the building official may require it to be exposed, or supported by an acceptable evaluation, so compliance can be verified. St. Lucie County, for instance, notes that concealed work may require a third-party engineering analysis. Requirements depend on the type of work and the local authority.
Here is our friendly advice: do not open walls or hire an evaluator until you have talked to the building department. Opening things up prematurely can waste money, and an engineer's report that does not match what the jurisdiction wants will not help you.
A sealed engineer letter is often the cleanest way to document what cannot be seen. If you are curious how this works, our guide on using an engineer letter to save your permit walks through it.
Step 5: Submit the Application and Expect Review Comments
Once your package is ready, you submit it through the municipality's preferred channel, whether that is an online portal, email, or in person. Then comes plan review.
A quick note on timing. Florida Statutes §553.792 sets review deadlines for certain complete and sufficient building permit applications, including 30 business days for specified permits on structures under 7,500 square feet and 60 business days for several other listed categories. However, that statute does not create a separate statewide deadline specifically for ATF approvals. The best move is to ask the local jurisdiction how long it typically takes to process these applications.
Do not be discouraged by review comments. They are normal. Reviewers may ask for added engineering, corrected drawings, or clarification of product approvals. Responding quickly and completely keeps your file moving. Our team handles this daily through plan review coordination and revisions and resubmittals.
Step 6: Pass Inspections and Close Out the Permit
After approval and issuance, the work still has to be inspected. Depending on the project, inspectors may verify framing, electrical, plumbing, mechanical, roofing, or final conditions. If any portion fails, you correct it and schedule a re-inspection.
- Pay the permit fees once the municipality issues the permit.
- Schedule the required inspections.
- Correct anything the inspector flags.
- Pass final inspection.
- Confirm the permit is closed in the municipality's system.
That last step matters more than most people realize. A permit that stays open will show up again at refinancing or closing. Some projects use a licensed private provider for faster scheduling; learn more about private provider inspections and how they compare in this article on private provider vs. building department in Florida.
What Does a Municipality After-the-Fact Permit Cost?
Here is the honest answer: it depends on where you live. The available sources do not establish a single statewide ATF fee, penalty amount, or processing time. Each jurisdiction sets its own schedule, and you should verify current fees with the authority having jurisdiction.
As one example, St. Lucie County says its after-the-fact permit fee is double the regular fee. That is a county-specific practice, not a statewide rule. Other municipalities may charge differently, so never assume the doubled-fee model applies to you.
| Cost Factor | What to Expect |
|---|---|
| Permit fee | Set locally; some jurisdictions charge a multiple of the standard fee |
| Plans and as-builts | Depends on scope and complexity of the work |
| Engineering analysis | May be required, especially for concealed or structural work |
| Corrections and re-inspections | Varies with how much work must be brought up to code |
| Fines or enforcement costs | Depends on local ordinance and whether a violation case exists |
For a closer look at budgeting, check out after-the-fact permit cost in Florida.
What Happens If You Do Nothing?
It is tempting to hope the problem quietly disappears. Unfortunately, unpermitted work tends to resurface at the worst moments, such as a home sale, an insurance claim, or a neighbor's complaint.
Enforcement is handled locally, and it varies. St. Lucie County, for example, warns that unresolved violations may result in a notice of violation, fines, or a lien. The exact process and consequences depend on the local ordinance and your circumstances.
- Home sales: Buyers, lenders, and title companies may flag open or missing permits and delay closing.
- Insurance: Unpermitted work can complicate claims.
- Code enforcement: A complaint can trigger a notice of violation and fines.
- Safety: Work no one inspected may hide real hazards.
Learn more about the stakes in penalties for building without a permit in Florida and whether a home sale can close with unpermitted work.
Tips for Each Type of Property Owner
Homeowners and Residential Property Owners
Start with the building department call, then gather photos and any receipts or contracts. If you bought the home with unpermitted work, you are not alone, and the same ATF process applies. Our homeowner services are designed for exactly this.
General Contractors and Design Trades
If a subcontractor skipped a permit on your job, move fast. Document the scope, get your drawings and engineering aligned, and coordinate with the municipality before a stop work order lands. See how we support general contractors.
Solar Companies
Solar installs need code-compliant structural and electrical documentation. If an array went in without a permit, expect the reviewer to want roof-structure verification and electrical details. Visit our page for solar contractors.
Realtors, Investors, and Buyers
Unpermitted work discovered during due diligence does not have to kill a deal. Researching permit history early gives everyone time to legalize. Explore our realtor and closing support.
Can a Permitting Service Apply on Your Behalf?
Yes, in many cases. A permitting service can identify the correct authority, assemble the application and technical documentation, coordinate inspections, and track the file. What it cannot do is approve the permit. Only the local building department can decide whether the work complies.
At 1 Contractor Solutions, we act as Florida's outsourced permitting department across all 67 counties. Our drafting and engineering are in house, and our own engineer signs and seals the work, so when a reviewer flags something, we fix it without waiting on an outside consultant. Want to see how it works? Read about our permit facilitation and filing and our engineering services. You can also see what customers say: Visit us on Google — 1 Contractor Solutions.
We are local to Florida's busiest jurisdictions, including Hillsborough County, Miami-Dade County, and Orange County, so we know how each office handles ATF files. And if you are facing a stop work order or a closing deadline, our urgent permit rescue team can step in fast. Stay connected and follow us on LinkedIn or follow us on Facebook for more Florida permitting tips.
Quick Checklist: Your ATF Game Plan
- Confirm the correct municipality or county for your address.
- Search for open permits, expired permits, and code violations.
- Call the building department for its ATF checklist and fee schedule.
- Gather photos, contracts, product approvals, and contractor details.
- Order as-builts, site plans, and engineering if required.
- Do not expose concealed work until the jurisdiction confirms what it needs.
- Submit, answer review comments quickly, and pass inspections.
- Confirm the permit is closed in the system.
Ready to Fix Unpermitted Work the Easy Way?
Getting a municipality after-the-fact permit in Florida is very doable once you know the steps. The key is to confirm jurisdiction first, document the work thoroughly, respond quickly to reviewers, and finish with passed inspections and a closed permit. You do not have to figure it out alone.
If you would like a team that handles the plans, engineering, filing, and follow-up for you, we would love to help. Reach out today to get a free quote, and let us get your permit approved and your project moving.
FAQs
How do I get an after-the-fact building permit in Florida?
First, confirm which city or county issues permits for your address, then ask that building department for its ATF checklist and fee schedule. Gather your documentation (often as-builts, engineering, and product approvals), submit the application, answer any review comments, and pass the required inspections. Every jurisdiction runs its own process, so a quick call up front saves a lot of time.
How much does an after-the-fact permit cost in Florida, and can the fee be doubled?
There is no single statewide ATF fee, so costs depend on your municipality or county. Some places do charge more than the standard rate. St. Lucie County, for example, says its after-the-fact permit fee is double the regular fee, but that is a local practice, not a statewide rule. Always verify current fees with your building department.
What happens if unpermitted work is hidden behind walls or ceilings?
The building official may require the work to be exposed, or supported by an acceptable evaluation such as a sealed engineering analysis, so compliance can be verified. Requirements vary by work type and jurisdiction. Contact the building department before opening any walls or paying for an evaluation.
Can a contractor or permitting service apply for an after-the-fact permit on my behalf?
Yes, in many cases a permitting service can identify the right authority, prepare the plans and documentation, file the application, and coordinate inspections for you. The service cannot approve the permit, though. Only the local building department decides whether the work complies.
What penalties can Florida municipalities impose for work done without a permit?
It depends on the local ordinance and your situation. Possible consequences include a notice of violation, fines, or a lien, as St. Lucie County warns. Resolving the issue through an after-the-fact permit is usually the best way to head off escalating enforcement.
We do this work every day across all 67 Florida counties. Call (866) 314-6931 and we will tell you what your situation actually requires — including when you do not need us.
Related services
Permit Facilitation & Filing
You have a crew scheduled, a client asking for dates, and a permit sitting somewhere in a queue you cannot see. We file it, w…
See the servicePlan Review Coordination
A permit in plan review is not one queue. On a commercial project it can be six queues, each with its own reviewer, its own c…