12 Pros Who Can Pull a Building Permit in Orlando (2026)
Wondering who can pull a building permit for you in Orlando? Meet 12 licensed pros and helpers, plus owner-builder rules and what to file in 2026.

Key Takeaways
-
Only a Florida-licensed contractor within their license scope, an eligible owner-builder, or an authorized representative acting for one of them can be the permit holder in Orlando.
-
Permit expediters, drafters, engineers, and private providers can help prepare, file, or review, but none of them can replace the licensed contractor or owner-builder on the permit.
-
Confirm whether your property is under City of Orlando or unincorporated Orange County before hiring anyone, since each has its own permit procedures and systems.
-
Owner-builder status is narrow: you must personally sign the application, physically supervise non-licensed work, and improve property for your own use, not for sale or lease.
-
Electrical, plumbing, mechanical, and roofing work may still require licensed trade contractors even when an owner-builder pulls the permit.
-
Projects over $5,000 generally need a Notice of Commencement recorded before work begins, and the review clock only starts once the application is complete.
You have a project in mind, a contractor on speed dial, or maybe a stack of paperwork on the kitchen table, and one big question: who can pull a building permit for me in Orlando? It is a fair thing to wonder, and the answer is a little more interesting than "just call the city."
Here is the short version. In Orlando, a building permit is generally pulled by a Florida-licensed contractor, an eligible owner-builder, or an authorized representative who submits the paperwork on behalf of the responsible contractor or owner. That last group includes permit expediters who help prepare, file, and track the application. They are a real help, but they cannot replace the licensed contractor or the owner-builder.
This guide walks through 12 specific people and roles that can help you get a permit moving, what each one can and cannot do, and how to pick the right path. Whether you are a general contractor, a solar company, a realtor, or a homeowner planning an addition, you will find something useful below. Let's dig in.

First, Which Jurisdiction Controls Your Property?
Before you hire anyone, confirm who actually issues your permit. An Orlando mailing address does not guarantee City of Orlando jurisdiction. Some properties sit in unincorporated Orange County, and the application procedures differ. The City of Orlando has its own published process, while Orange County runs its own separate Fast Track system.
If you are still sorting this out, our guide on City of Orlando vs. Orange County roof permits shows how much the answer can change your paperwork. You can also use the building department lookup tool to confirm the right office.

The 12 People Who Can Help You Pull a Building Permit in Orlando
Think of this list as a map. Some of these roles are legally allowed to be the permit holder. Others are helpers who prepare and submit the work for the person who is.
1. A Florida-Licensed General Contractor
This is the most common answer to who can pull a building permit for me in Orlando. A licensed general contractor can pull permits for projects within the scope of their license. The City's residential checklist asks for contractor license and business documentation, and the contractor must be associated with the permit before it is issued.
If you are a general contractor with a license from another county, you may also need local registration. Our walkthrough on registering your contractor license in a new Florida county covers the basics.
2. A Licensed Roofing Contractor
Roofing is a licensed trade, so a Florida-licensed roofing contractor is the right person to pull a roof permit. If you are a homeowner hiring a roofer, ask to see the license and confirm it is active before any work begins.
3. A Licensed Electrical Contractor
Electrical work, including panel upgrades, service changes, and new circuits, generally calls for a licensed electrician. The electrical contractor pulls the electrical permit tied to the scope of work.
4. A Licensed Plumbing Contractor
The same logic applies to plumbing. Water heaters, re-pipes, and new fixtures typically need a licensed plumber who pulls the permit and schedules inspections.
5. A Licensed Mechanical (HVAC) Contractor
If your project involves a new air conditioner, ductwork, or mechanical changes, a licensed mechanical or HVAC contractor is typically the permit holder for that trade.
6. A Solar Contractor
Solar installations require code-compliant structural and electrical documentation along with a properly licensed installer. Solar companies often lean on outside help to keep filings moving. If that is you, take a look at 7 solar permit filing mistakes in Orange County before you submit.
7. An Eligible Owner-Builder
Yes, homeowners can sometimes pull their own permit. Florida law allows an owner-builder exemption, but it is limited, and we will cover the rules in detail in the next section. Our guide to the owner-builder permit in Orlando goes deeper if you are leaning this way.
8. A Permit Expediter or Authorized Representative
A permit expediter can manage the application, submit documents, and follow up on reviewer comments. Here is the important part: an expediter helps with the process, but does not replace the licensed contractor or owner-builder status. The contractor of record still needs to meet City requirements.
To understand what this service really covers, read how to know what a permit expediter does in Florida.
9. A Permit Facilitation Firm
A facilitation firm goes a step beyond basic filing. It checks the jurisdiction, assembles the required documents, files the application, tracks it, and works every reviewer comment through approval. If paperwork feels like a second job, this is the role that gives you your time back.
1 Contractor Solutions works as an outsourced permitting department for exactly this kind of work, and you can see the full scope on the permit facilitation and filing page.
10. A Drafter or Designer
A drafter prepares the plan set that goes into the permit package. Drafters do not pull permits on their own, but clean drawings are often the difference between a quick approval and a pile of comments. If you already have an engineer, drafting-only services let you keep your seal and your client relationship intact.
11. A Florida Engineer or Architect
When your project needs structural or MEP drawings, a licensed engineer or architect signs and seals them. They do not pull the permit, but their sealed drawings are part of the application. Not sure who needs to seal what? See who seals structural drawings for Florida permits.
12. A Private Provider
A private provider can perform plan review and inspections instead of leaving your project in the local queue. This does not change who the permit holder is, but it can change how fast review moves. Learn more about private provider plan review and inspections if speed matters on your job.
Who Is Legally Allowed to Hold the Permit? A Quick Comparison
The table below sorts the roles above by what they can actually do. This is a handy way to see where the legal authority sits and where the helpers fit in.
| Role | Can Be the Permit Holder? | What They Typically Do |
|---|---|---|
| Licensed contractor (GC, roofing, electrical, plumbing, mechanical) | Yes, within license scope | Pulls permit, performs work, schedules inspections |
| Eligible owner-builder | Yes, if conditions are met | Signs application, supervises work on site |
| Permit expediter / facilitation firm | No, acts for the responsible party | Prepares, files, tracks, and works comments |
| Drafter / designer | No | Prepares plan set for the application |
| Engineer / architect | No | Signs and seals drawings and letters |
| Private provider | No | Performs plan review and inspections |
The Owner-Builder Rules You Need to Know
The owner-builder route is tempting because it can save money. It also comes with real obligations, so let's keep expectations realistic.
Under Florida Statutes section 489.103(7), the owner-builder exemption is limited. In general, the owner must:
- Personally appear and sign the permit application.
- Directly and physically supervise any work that is not performed by licensed contractors.
- Meet local requirements showing they understand the legal obligations that come with the exemption.
- Be improving a qualifying property for their own occupancy or use, not offering it for sale or lease.
Florida law also provides a narrow commercial exemption for qualifying owner-use projects costing no more than $75,000. Residential eligibility and other conditions still apply.
Two cautions are worth underlining. First, an owner-builder cannot use the exemption to let an unlicensed person act as a contractor. Second, licensed trades may still be required for electrical, plumbing, mechanical, or roofing work depending on the scope and the law. If you plan to sell soon after finishing, read how to sell an owner-builder home within a year in Florida first.
What Orlando Typically Asks For
Every project is different, so always confirm current requirements with the permitting authority. That said, here is a friendly look at the common building blocks in the City of Orlando process.
- Start with the right application. The City's process begins with the appropriate permit application for your project type.
- Provide licensing or owner-builder documents. The residential checklist calls for contractor license and business documentation, or owner-builder documentation, as applicable.
- Submit plans digitally. After processing, applicants receive instructions for digital plan submission.
- Pass the completeness check. A complete application is what starts the review timeline.
- Respond to reviewer comments. Review times vary by project type and scope, so quick, accurate responses help.
If you want to estimate how long your own project might take, our Orlando building permit timeline guide is a good companion read.
Key Numbers and Requirements at a Glance
Here are the concrete figures worth keeping handy. They come from City of Orlando guidance and Florida statutes, and they can change, so verify before you file.
| Item | What to Know |
|---|---|
| Completeness review | The City says it reviews applications for completeness within 5 business days. This is a completeness check, not a guarantee of final approval. |
| Notice of Commencement | Generally required for City projects with a value or contract price over $5,000, recorded before work begins, with a copy provided to the City and posted at the job site. |
| Commercial plan-review deposit | Commercial applications may require a non-refundable deposit equal to 25% of the plan-review fee. |
| Owner-builder commercial exemption | Qualifying owner-use commercial buildings costing no more than $75,000 under Florida Statutes 489.103(7). |
Common Mistakes When Asking Who Can Pull a Permit
A little foresight goes a long way here. These are the slip-ups we see most often when people ask who can pull a building permit for me in Orlando.
- Assuming a helper can replace a license. An expediter or drafter cannot stand in for a licensed contractor or a qualifying owner-builder.
- Guessing the jurisdiction. City of Orlando and Orange County are separate systems with different procedures.
- Letting a contractor use your name. A contractor asking the owner to pull the permit so they can skip licensing is a red flag. Read about the unlicensed contractor mistakes Florida owners make to protect yourself.
- Skipping the Notice of Commencement. If your project is over the $5,000 threshold, plan for it before work starts.
- Submitting an incomplete package. The review clock does not start until the application is complete.
What If Work Already Started Without a Permit?
It happens more than people admit. Maybe a prior owner skipped permits, or a contractor disappeared mid-job. The good news is that Florida has paths forward. After-the-fact permitting can bring work into compliance, though it usually requires as-built drawings and sometimes an engineer letter.
If this sounds like your situation, start with whether Orange County allows after-the-fact building permits and how to legalize unpermitted work in Florida. You can also explore our after-the-fact and expired permits service.
How to Choose the Right Person for Your Situation
Different readers need different answers, so here is a quick way to match yourself to the right help.
- General contractors: You are the permit holder, but outsourcing filing, tracking, and revisions frees your crew schedule. See our page for general contractors.
- Solar companies: Prioritize code-compliant structural and electrical documentation and consistent filings. The solar contractors page explains how we help.
- Realtors and investors: Permit research can save a deal. Check out support for realtors and our guide on how to find open permits on a Florida property.
- Homeowners: If you are not a licensed contractor, hire one, or confirm you truly qualify as an owner-builder. Our homeowner resources are a friendly place to start.
- Architects, designers, and specialty trades: Outsourced drafting, MEP, and structural support can keep your projects moving without adding in-house headcount.
Many Orlando-area owners also appreciate seeing real feedback before they commit. You can visit 1 Contractor Solutions on Google and read what customers say about working with us on Florida permits.
A Few Smart Habits Before You File
Here is a short checklist to keep your Orlando permit on track.
- Confirm the jurisdiction, City of Orlando or Orange County.
- Verify any contractor license on the state's licensing lookup before signing a contract.
- Gather plans, product approvals, and any required sealed drawings early.
- Check whether a Notice of Commencement applies to your project value.
- Decide who will respond to reviewer comments, and how fast.
For official statute language, you can read the text of Florida Statutes section 489.103 directly, and the City publishes its current steps on its Get a Permit page. Both are worth bookmarking.
Wrapping Up
So, who can pull a building permit for me in Orlando? A Florida-licensed contractor, an eligible owner-builder, or an authorized representative acting for one of them. Helpers like expediters, drafters, engineers, and private providers all play important supporting roles, but none of them can bypass Florida's licensing rules.
The best move is to match your project to the right responsible party, confirm your jurisdiction, and make sure your package is complete before it goes in. If you would rather hand off the paperwork and keep your project moving, get a free quote from our team. We respond fast, we know Orlando and the rest of Florida, and we would be glad to help you get approved.
Want to stay in touch? You can follow us on LinkedIn and follow us on Facebook for Florida permitting tips, or learn about the team behind our content at Brain Buzz Marketing.
FAQs
Who is legally allowed to pull a building permit in Orlando?
A Florida-licensed contractor working within the scope of their license can pull a permit, and so can an eligible owner-builder who meets Florida's requirements. An authorized representative or permit expediter can prepare and submit paperwork, but they act for the responsible contractor or owner rather than replacing them.
Can a permit expediter pull a permit for me, or do I still need a licensed contractor?
A permit expediter is a wonderful helper for preparing, filing, and tracking your application, but they cannot bypass Florida's licensing rules. You still need a licensed contractor or a qualifying owner-builder tied to the permit before it is issued.
Can I pull my own building permit as a homeowner in Orlando?
Often yes, if you qualify as an owner-builder. You generally must personally appear and sign the application, directly supervise any work not done by licensed contractors, and be improving a property for your own use that is not offered for sale or lease. Licensed trades like electrical, plumbing, mechanical, or roofing may still be required.
Do I need a Notice of Commencement for my Orlando project?
For City of Orlando projects with a construction value or contract price over $5,000, a recorded Notice of Commencement is generally required before work begins. A copy must be provided to the City and posted at the job site.
How do I find out whether my property is in the City of Orlando or unincorporated Orange County?
An Orlando mailing address does not guarantee City jurisdiction, so check with the City and with Orange County's Division of Building Safety. A building department lookup tool or a permitting professional can confirm the right authority before you file, since the two systems use different procedures.
We do this work every day across all 67 Florida counties. Call (866) 314-6931 and we will tell you what your situation actually requires — including when you do not need us.
Related services
Permit Facilitation & Filing
You have a crew scheduled, a client asking for dates, and a permit sitting somewhere in a queue you cannot see. We file it, w…
See the servicePlan Review Coordination
A permit in plan review is not one queue. On a commercial project it can be six queues, each with its own reviewer, its own c…